One of your house’s most important rooms is the bathroom. If you are going to be without a fully functioning bathroom for an extended period, it’s going to be more than simply annoying.
Our purpose is to instruct you on what it takes to renovate and how long it takes to remodel a bathroom so that you can plan your renovation in a realistic time frame.
According to the Housing Industry Association, a complete installation as part of a refurbishment takes between 13 and 25 days on average. But these estimated times will extend on constructors’ issues.
Several factors affect when remodeling
- nature of the remodel
- size of the bathroom
- are you hiring for the work or do it yourself
- availability of the chosen materials
- availability of external contractors
- how much of extending are you doing demolishing- knocking down the walls, removing windows
- are you using the existing water lines
Depending on the above factors, the estimated time may extend as of the availability. But averagely, we can make a timeline and start the work. Under ideal conditions, modest remodels can complete in 23 days on average. But this will become if you have a good contractor who has a good team of contractors. If they take a break on weekends, this will extend up to one month. Actual world downtime or unanticipated events might make it twice as long, 46 days, or roughly nine weeks in real life.
It’s a good idea to know what will happen when and how long each stage of your bathroom makeover will take before you start.
The stages of a renovation are as follows:
1. Planning
2. Sign the contract and finalize the plan
3. Ordering materials
4. Demolition
5. Laying the Groundwork for Your New Bathroom
6. Installing Your New Features
7. The final touches
1. Planning – 1 to 2 months (depends on you)
This phase depends on your interest and efficiency. You will search for the designs and fittings through the internet and come up with a final decision. An assessment of the site usually conducts at this phase. It would help if you asked a tradesman or contractor; to determine the scope of the project, style and functionality requirements, and budget.
2. Sign the contract and finalize the plan – 01 week
A contract will prepare for you to review once you’ve chosen a contractor. It will include a detailed explanation and cost estimate, and a timeline for payment.
3. Ordering materials – 01 to 08 weeks
Identify who will be in charge of selecting and ordering fixtures, such as tiles and faucets. If there are materials that ship from overseas, make sure to talk with your contractor. Otherwise, it will extend your pre-planned schedule more. Before starting the remodeling, make necessary attempts to make this gap shorter.
4. Demolition – 01 to 02 days
This step should complete fast. A difficult-to-clean bathroom will take longer to clean, such as one on the second floor. If you locate asbestos, it can take a long time to remove it. Additionally, this can add an extra 1-2 days of work. Installation of structural beams to support new walls or windows will also occur during the demolition stage.
5. Laying the Groundwork for Your New Bathroom
This phase is getting into several stages.
i. Carpentry And Structural Works – 01 to 02 days
As soon as your old bathroom strip down to its skeleton bones, new structural beams are installing to support new walls or new windows, among other things. Allow 1-2 days of labor, depending on the scale of the project. If the underlying structure is sound, you may not need carpentry services.
ii. Plumbing Rough-In – 01 to 02 days
Moves including tubs and toilets might take up to two days.
iii. Electrical Rough-In – 01 to 02 days
This phase should not take more than a day for a qualified expert electrician. The term “rough-in” refers to installing the electrical cables, but not the final connections.
iv. Sheeting – 01 to 02 days
Sheeting of ceiling and walls is completing in this stage
v. Tile Prep – 01 to 02 days
Screed, a type of cement bedding, will be laid. Additives can rush up the drying process of screed by as much as 48 hours.
vi. Water Proofing – 01 to 02 days
Waterproofing is arguably the most crucial aspect of your makeover. If water seeps into the floor and wall spaces, it can cause irreparable damage to a house. As a result, the region is sealing with a watertight liquid rubber barrier. After 24 hours, waterproofing is dry.
6. Installing Your New Features – 01 to 02 days
In this stage, the final plumbing and electrical fit are completing. During plumbing, will install or connect all of your chosen items. Similarly, the electrician will install all electrical components in the areas where they had already roughed in.
7. The final touches – 01 to 02 days
Adding toilet paper holders, towel hooks, etc., and cleaning the bathroom are the only things left to do.
This is an idealized timetable, which is much more significant. It means that all days have pressed together such that there are no gaps between them. They believe that as soon as one person finishes, the next one steps in. Do not be surprised if the actual timetable is more than double this idealistic one.
HANDICAP BATHROOM REMODEL
Modern bathrooms are indeed highly efficient and visually appealing. But they are not fundamentally secure for the elderly or disabled.
You or a loved one may need a bathroom that is handicap accessible so that you or other users can be comfortable and accessible. There are few steps to take on when in handicap bathroom remodel.
- The bathroom should be enough space for a wheelchair.
- Make the door wide enough to pass a wheelchair.
- Think about the accessibility of light switches while designing.
- The ideal toilet seat height should be the same level as the wheelchair to facilitate the transfer.
- Toilet grab bars and bathtub/shower grab bars at appropriate heights must fit.
- For those who use wheelchairs, sink heights may need altering. Users who can walk but have trouble bending may benefit from taller sinks and countertops. Switch to lever handles on sink taps instead of twisting handles, or go for a touchless faucet instead
When designing the handicap bathroom remodel, make sure to consider the above factors strictly.